Skip to content Skip to main menu
52Z003_M5_medium

James Paget University Hospital: Hospital sterilisation and decontamination unit (HSDU)

Welcome to the project page for the JPUH HSDU project, which is being refurbished by Morgan Sindall Construction.

Here you can read about the project and its positive effect on the community, and track progress as it happens.

Get in Touch

Progress

Key facts

This project will be delivered in phases. The progress bar above is indicative of the current phase of works (phase 1).

Proposed phases:

Phase 1 – April 2026

Phase 2 – July 2026

Phase 3 – October 2026

About the project

HSDU, is the new refurbished unit located in Great Yarmouth.

The project is reconstructing HSDU at James Paget University Hospital and doing RAAC remediation works.

Project highlights

We will be installing full RAAC failsafe supports to the entire area and the follow requirements to allow JPUH to have a compliant HSDU.

  • Core infrastructure:
    • Utilities: Treated water for washers (RO/softened as specified), validated clean steam, HVAC with pressure differentials and temperature/humidity control, adequate drainage, medical‑grade compressed air where required, backup power.
    • Ergonomics & IPC: Height‑adjustable benches, adequate lighting, magnification, ultrasonic cleaners with lids, splash protection, cleanable finishes, hand hygiene stations, and PPE provisions.
    • Logistics: Dirty and clean transport routes (trolleys/lifts), secure loan‑kit intake area, quarantine spaces for non‑conformances, and a dispatch area adjacent to sterile stores.
  • Decon & sterilisation assets: Pass‑through washer‑disinfectors, ultrasonic cleaners, inspection scopes, heat sealers, steam sterilisers (autoclaves) sized for load profiles, low‑temperature sterilization (e.g., H₂O₂ plasma) if required by device IFUs, drying cabinets, and pack/wrap systems.
  • Instruments & packaging: Standardise instrument sets; validated packaging (pouches/wraps/containers) compatible with the chosen sterilisation modalities; robust stock and repair loop.
  • IT & tracking: Implement an instrument tracking system (scan at each step), barcode/UDI, load building and electronic load records, BI/CI result capture, dashboarding for KPIs, device IFU library, and integration with theatre scheduling where possible.
  • Commissioning & validation: IQ/OQ/PQ for every washer and steriliser; routine control with BIs/CIs, Bowie‑Dick/Helix tests, washer performance tests (protein/residue checks), water/steam quality monitoring, and preventive maintenance with service contracts and calibrated sensors

Get in touch

Craig Baldry, Site Manager is the dedicated community contact for the HSDU project and will maintain communications with neighbours and the surrounding community. If you have any questions, please do get in touch with Craig via the contact form at the bottom of the page with any queries regarding the project.

Meet the HSDU team

Craig B

Craig Baldry

Site Manager

AW

Andy Woollsey

Site Manager - Night Shifts

AF-2

Amy French

Apprentice Site Manager

LW-2

Luke Wilbourne

Project Manager

MA-2

Mark Alexander

Senior Site Manager

BV-2

Ben Virdee

Project Manager

JB-2

James Branton

Senior Planner

Mario-2

Mario Rackham

Operations Director

TG-2

Tom Grant

Quantity Surveyor

WS-2

Will Smith

Managing Quantity Surveyor

RC-2

Richard Clements

Senior SHE Advisor

Project Partners

Get in touch