The Olympus Building

Responding to significant local demand for secondary places in South Gloucestershire, the new Olympus Building at Abbeywood Community School has helped expand capacity to 1,500 students and increase its annual intake from 180 to 240 pupils. Delivered within a live school environment, the purpose-built English teaching block provides modern, high-quality learning spaces that will support educational excellence and serve both students and the wider community for years to come.

Key Stats

  • Handed over 4 weeks early
  • Delivered within budget
  • 10/10 client satisfaction
  • 61% local labour (<20m)
  • 73% local spend (<20m)
  • 97% SME engagement
  • 45/45 CCS scores
  • 43.5% Social Value return
  • 75 school engagement hours
  • 36 work placement weeks
  • ZERO defects
  • ZERO SHEQ incidents

At a Glance

Client

South Gloucestershire Council

Budget

£11.7m

Completion

January 2026

Location

Bristol

Framework

SCAPE National Construction

Sector

Education

Social value

£5.1m

Sustainability

180 tonnes of carbon saved

Our Approach

Delivered through the SCAPE Construction framework, the project involved a phased programme designed to expand capacity while maintaining full school operations throughout. Central to this approach was the early installation of a two-storey Temporary Learning Village, providing four fully equipped classrooms for up to 120 students. Installed during the summer half term, the works were carefully coordinated within a constrained site, with additional complexities posed by a nearby live railway line requiring detailed logistics crane planning.

Carefully sequenced around the school calendar, phase one focused on enabling and refurbishment works, including the extension of the dance studio and reconfiguration of changing facilities, to better serve both pupils, but also the wider community, which makes extensive use of the school’s sporting facilities in the evenings. This was complemented by the modernisation and decarbonisation of the school’s kitchen, delivered in time for the start of term.

This phase was followed by the construction of the new Olympus Building — a 1,000 sqm two-storey teaching block providing 10 classrooms, staff facilities and dedicated welfare spaces. Designed to integrate seamlessly with the existing campus, the scheme also included car park enhancements, delivering ten additional spaces, including two electric vehicle (EV) charging points.

Delivering on a live school site presented several challenges, including complex logistics, multiple access points, and the need to manage a segregated site compound located some distance from the main works area. Movement across the site was carefully controlled, supported by dedicated gate supervision and agreed crossing points to ensure the safe separation of construction activity and student movement. These constraints were further compounded by an Environment Agency-controlled culvert running beneath the site, requiring careful coordination and approvals. Through robust planning and close collaboration with stakeholders, the project was delivered safely and efficiently throughout, achieving a 100% CLOCS and 45/45 Considerate Constructors Scheme scores.

A focus on sustainability

Working collaboratively with NVB Architects, consultants and subcontractors, the project also incorporated air source heat pumps, photovoltaic panels and energy-efficient systems to reduce operational carbon, alongside a high-performing building fabric that significantly exceeded airtightness targets. Digital tools, including Autodesk Construction Cloud and Oculo 360, were also used to enhance design coordination, enabling detailed programme planning and clash detection to be resolved prior to construction.

Throughout the project, the team achieved a reduction of 180 tonnes of carbon dioxide equivalent (CO2e) through initiatives including the use of electric arc furnace steel, timber waste recycling with Community Wood, and the reuse of concrete hoarding blocks from another Morgan Sindall scheme. This saving – measured using CarboniCa, an intelligent carbon reduction tool – is equivalent to heating 55 UK homes for a year.

Morgan Sindall also piloted one of the construction industry’s first zero-waste plasterboard programmes in partnership with British Gypsum. As part of this trial, plasterboard was pre-cut off-site, monitored and weighed to minimise waste and improve efficiency.

Close collaboration with the school was central to delivery. Regular meetings, clear communication and a consistent site team ensured strong alignment throughout, enabling early handover and providing valuable early access for operational preparation. This ensured a smooth transition into occupation, with handover carefully aligned to the school calendar, allowing the school to prepare the building for pupils returning after the half-term break.

Abbeywood Community School 001
Abbeywood Community School 041
Abbeywood Community School 036

Working with the Community

From the outset, the project focused on creating lasting value for the local community, generating more than £5.1 million in social value through initiatives that supported education, skills development and local economic growth.

A strong focus was placed on education and skills, with 75 school engagement hours providing students with meaningful insight into careers in construction. This included site visits, careers events at Abbeywood Community School and South Gloucestershire and Stroud College, alongside hands-on workshops, giving students direct exposure to a live construction environment. In particular, engineering students at Abbeywood were invited to visit the project in detail, learning about environmental sustainability in construction and to see technologies such as solar panels and low-carbon heat pump systems first-hand.

In addition, 36 weeks of work placements were delivered, providing tailored opportunities for students to build practical skills and confidence, from multi-disciplinary project experience through to trade-specific placements with supply chain partners.

The project also delivered wider community and environmental impact through a range of targeted initiatives. The team supported local causes through a foodbank donation drive and refurbishment works at Pretoria Road Allotments, enhancing a shared space used for community activities and school engagement. In parallel, partnerships with organisations such as Bristol Community Wood Recycling and the New Leaf Project helped divert waste, support local employment opportunities and contribute to the creation of new green spaces.

A strong commitment to the local economy further amplified this impact, with 73% of project spend and 61% of labour sourced within 20 miles. 99% of delivery was also with through SMEs, with 97% of the supply chain was paid within 15 days, supporting cash flow for local businesses and strengthening economic resilience.

IMG_0633
IMG_7667 - Copy
IMG_E6057
I am thrilled that this project is now complete and these improvements to the school will be enjoyed by staff and pupils alike for years to come. We have invested almost £12 million in this project, and in other parts of the district we have been able to get projects that had stalled underway. We don’t just want to talk about the future for our children in South Gloucestershire, we want to help build it. Better school buildings and catering for growing pupil numbers is a key part of that mission.” – Councillor Ian Boulton, South Gloucestershire Council Cabinet Member for Schools
Abbeywood Community School continues to grow at the heart of our community. To support this growth and uphold our high standards, significant investment in our facilities has been welcomed. Alongside our enhanced catering, changing and drama spaces, this state-of-the-art building strengthens our provision and ensures we continue to offer a first‑class learning experience. Together with our main school and the Engineering Centre, the Olympus Building positions us to serve our community with excellence for many years to come.” – Claire Moloney-Banks, Interim CEO of The Olympus Academy Trust